Containerized diesel generators: when the whole power plant ships in a box

Above roughly 500 kVA, a genset stops being a machine and becomes a small building — it needs switchgear, a fuel system, ventilation, fire detection and a place to put all of it. A containerised module delivers that as one tested unit that a crane can set down in an afternoon.

What actually ships inside the container

The genset is the obvious part. The rest is what determines whether commissioning takes two days or two weeks.

Sizing: which container for which rating

ShellTypical ratingInternal layoutGross weight
10 ft200–350 kVASingle compartment, tank in base4.5–6.5 t
20 ft400–1000 kVAGenset room + switchgear room9–14 t
20 ft high cube800–1250 kVATaller shell for large radiators and top-mounted exhaust12–16 t
40 ft1250–2500 kVA (single) or 2 × 1000 kVATwo compartments, walk-in service aisle22–32 t
40 ft high cube, twin2 × 1500–2000 kVA, N+1Two sets, common switchgear, shared tank30–38 t

Weight matters more than size for shipping. A 40 ft twin module at 35 t exceeds many road limits and needs a low-bed trailer plus permits in most countries. Confirm the route from port to site before agreeing the configuration — the cheapest module is not cheap if it cannot reach the site.

Paralleling and N+1: decide before the shell is built

Adding a second set to a single-set module later means replacing the switchgear, re-running busbars and re-certifying the protection scheme — usually 40–60 % of the original module cost. If there is any chance you will need redundancy, order the paralleling-ready configuration at the start: a busbar with a spare outgoing section, a controller that supports load sharing, and space in the switchgear compartment.

ConfigurationWhat it gives youWhen it is worth it
Single setSimple, lowest costStandby duty where a short outage is tolerable
Paralleling-ready singleAdd a second set later without rebuilding switchgearLoad likely to grow within 3 years
2 × 50 % with load sharingOne set carries the load if the other failsHospitals, data rooms, process plant
N+1 (2 × 100 % or 3 × 50 %)Full redundancy with maintenance without outageData centres, telecom hubs, continuous process

Medium voltage changes everything

Above about 1250 kVA, generating at 400 V means thousands of amps and busbars the size of your arm. Generating at 6.6 kV or 11 kV and stepping down at the point of use is usually cheaper and always easier to cable. A medium-voltage module adds a step-up transformer, MV switchgear and MV protection — and it changes who can work on the unit, because MV switching needs authorised personnel, not a mechanical technician.

Transport and lifting

Where containerised beats a silent canopy

Choose the container when: the rating is above 800 kVA, you need walk-in access for service, you want switchgear and fuel in the same delivery, the site needs a stackable or relocatable asset, or the project requires a documented fire-protection scheme. Choose a skid-mounted silent canopy when the set is under 500 kVA, access is tight, weight is a constraint, or the client simply wants the lowest installed cost.

Send the load list and the site plan

Tell us the rating, voltage, required autonomy, redundancy level and the route from port to site. We return a module layout, a single-line diagram and a firm price — within two working hours.

Request a quotation See price guide

Questions buyers ask

Can a containerised module be installed outdoors in hot climate?

Yes, and it is the normal case. The design ambient is usually 40 °C; above that, the set is derated and the ventilation fans are upsized. What matters is that the discharge air is not trapped — allow at least 3 m clear in front of the outlet and never place two modules outlet-to-outlet.

Is the container CSC-plated and certified for sea transport?

The shell is built to ISO dimensions and corner castings, and can be CSC-plated on request. Note that a genset module is not a freight container and will not usually be stacked in a container stack at sea — it ships as break-bulk or on flat rack, which affects freight cost.

How long does commissioning take on site?

Two to four days for a single module including offloading, positioning, cable termination, fuel filling, protection checks and a stepped load test. Twin modules with paralleling take five to seven days, because load sharing and protection coordination have to be proved at every step.

What fire protection is normally specified?

Heat and smoke detection with alarm to the site system is the baseline. Insurers commonly require clean-agent or aerosol suppression inside the genset compartment, plus fire-rated separation from the switchgear compartment. We build to the client's fire scheme; we do not substitute our own.