Sector briefs: four one-page PDFs you can forward to a client
Each brief is one A4 page cut down from the matching page on this site: how the rating is calculated, what the site has to provide, and what acceptance looks like. Every brief exists in English and Chinese. The PDFs carry a searchable text layer, so a consultant can paste a paragraph into a tender document.
No prices inside. Every figure is an engineering range — a real quotation is recalculated from your load list and site survey.
Four sector briefs
Hospital standby
Sized on critical plus fire load — 200–500 kW for 400–600 beds; three connection methods, UPS versus generator, three acceptance tests.
Data centre backup
The UPS step load is the real limit — 1.4–1.6× the UPS rating; harmonic derating, three steps at 10 kV, staggered chiller start.
Events and stadiums
A 5,000-capacity show at 350–500 kW; three load factors, dual feed plus UPS transfer times, noise and cable drop.
Emergency response
Rating and format by task, 30–400 kW; connectors set the clock, −25 °C starting, IP5X dust, procurement and export compliance.
All four briefs in one file
For a client who has already asked for “everything”. Four A4 pages merged as they are, no cover sheet: English bundle 986 KB, Chinese bundle 1610 KB. Small enough to send over WhatsApp or WeChat.
How to use them
Ask before you attach
One line first — “shall I send the one-page brief for your sector?” — then send the matching file only. An unrequested attachment usually lands in spam.
Prints as a show handout
A4, single sided, colours already set for print. The QR code bottom right opens the full page with photographs and specifications.
Numbers match the site
Same source as the web pages: identical rating bands, derating factors and acceptance tests. A client finding two different numbers is the fastest way to lose trust.
Want one written for your project?
Send the project type, location, load list (or transformer and UPS ratings) and the time-to-power requirement. We reissue the page under your project name, your rating band and your connection method, in English or Chinese, same day. Defence, border and government emergency work starts with end-user documentation and export-control clearance.
Want a brief written for your own project?
Send the project type, location and load list — you get a one-page brief in your project name, English or Chinese, the same working day.