Buying a diesel generator from China: how to verify the supplier
Most first orders from China go wrong for reasons that have nothing to do with the machine: the seller was a broker, the alternator was not what the datasheet said, or nobody was accountable once the container left the port. This page is the checklist we would use if we were the buyer — including the parts that do not flatter us.
Direct answer: verify three things before paying a deposit — a business licence whose registered scope covers generator sets, a factory load test report carrying the engine and alternator serial numbers, and warranty terms in writing that name who pays for parts and who pays for labour. A supplier produces all three within one working day. A broker sends a catalogue and a price.
Three kinds of seller, and where each one breaks
Almost every Chinese generator quotation comes from one of three types of company. The price difference between them is usually smaller than the difference in what happens when something goes wrong.
| Type | Strength | Where it breaks | How to tell in one email |
|---|---|---|---|
| Engine factory direct | Genuine engine, factory warranty on the power unit | Sells engines and bare sets, not finished projects — enclosure, controls, paralleling and export packing are often not their business, and minimum order is high | Ask for a 100 kW silent set with ATS and a load test report: they will quote an engine, not a package |
| Export trading company | Paperwork, freight rates, English correspondence | No engineering judgement on site conditions; the factory behind the quote can change between orders without telling you | Ask which factory, at which address, will build this unit — and whether you may video-call that workshop |
| Supplier-integrator | Specifies, matches engine to alternator to application, tests, documents, and stays accountable after arrival | Only as good as its test bench and its after-sales reach; smaller ones cannot support you in-country | Ask for the last three shipments to your region, and the name of the engineer who will answer the phone in year three |
None of these is dishonest by definition. The failure mode is buying from type 1 or 2 while believing you are buying from type 3 — paying project money for a catalogue service.
Six documents to request before a deposit
Each one closes a specific hole. If a supplier cannot produce a document, that is information, not an obstacle.
| Document | What it proves | What a weak or forged version looks like |
|---|---|---|
| Business licence (营业执照, with the 18-digit unified code) | The company legally exists and its registered scope covers generator set manufacture, sales or export | A photo cropped so the scope section is missing; a name that differs from the bank account holder |
| Customs registration (海关注册登记) | The company can declare export in its own name rather than borrowing another firm's licence | "We export through a partner" — fine, but then the invoice and the accountability are split |
| Factory load test report | The specific unit was run at load — not just started — with kW, voltage, frequency, oil pressure, exhaust temperature recorded | A blank template with no serial numbers; a report dated before the unit was built; a "test" that only lists start-up |
| Engine nameplate and serial photo | The engine is the platform quoted, at the rating quoted, and its serial can be checked with the engine maker | A stock photo; a rating that reads standby on a quote written as prime; a repainted unit |
| Alternator datasheet | Copper mass, insulation class, IP rating, single or double bearing, excitation type | "100 % copper" as a sentence with no datasheet behind it — the most common 30 % price gap hides here |
| Warranty terms in writing | Duration, hours limit, what is covered, who pays labour, who pays freight on parts, response time | A WeChat message saying "two years warranty"; no mention of labour or freight means you own both |
Six questions, and the answers worth accepting
- "What is the engine serial number of the unit you will build for me?" A supplier answers with a number or a clear "assigned at build, photographed before packing". A broker answers "we will send photos later".
- "Which alternator, and what is its copper mass?" The right answer names a maker and a model. The wrong answer is a claim about copper percentage with no model number.
- "Is this rating standby or prime, and what is the derate at 40 °C and 1000 m?" Any real supplier has the curve. A 250 kVA standby set is roughly a 200 kVA prime set — if the seller does not know this, they are reselling.
- "Who owns the vehicle type approval on a truck-mounted unit?" For power vehicles the answer must be a licensed vehicle builder, not the genset supplier. If someone claims to hold type approval for a converted chassis they do not build, keep asking.
- "What does the warranty exclude, and who pays freight on a failed part?" Vague answers here become expensive in year two.
- "Can I speak to a customer in my country who bought this rating?" Not a reference logo wall — a phone number or an email address. Suppliers with real export history can usually arrange one.
What a genuine quotation from China looks like on price
FOB China, 50 Hz 400/230 V, standard silent or open build, standby rating at 0.8 power factor. These are anchors for judging a quote, not offers — a quote far below the band usually has a smaller radiator, a lighter alternator or no load test.
| Rating | Typical build | FOB from (USD) | Lead time |
|---|---|---|---|
| 30 kW | Open / silent, Yuchai | 2,900 | 7–15 days (stock build) |
| 50 kW | Silent, Yuchai | 4,200 | 7–15 days |
| 100 kW | Silent, Yuchai | 7,300 | 10–20 days |
| 200 kW | Silent, Yuchai / Weichai | 11,500 | 15–25 days |
| 200 kW | Silent, Cummins + branded alternator | 18,900 | 25–40 days |
| 400 kW | Silent / container, Cummins | 33,500 | 25–40 days |
| 800 kW | Container, Cummins | 64,000 | 35–60 days |
Excluded from every FOB figure: ocean freight, insurance, duties, destination charges, offloading and installation. CE configuration, 60 Hz builds, non-standard voltages, synchronising panels and spare-parts kits are quoted separately. A single unit is a normal order — minimum order quantity of one is standard for this industry, and any supplier insisting on five is a factory, not a supplier.
Where we sit in this picture
We are a supplier-integrator, not an engine factory. Genset Hub is based in Liuzhou, Guangxi — the same city as Yuchai — and has been quoting and shipping diesel power since 2001. We do not own an engine plant, and we do not claim to.
What we do: specify the set against the load list and site conditions; match engine, alternator, controller and enclosure; build or supervise the build; load-test it; handle export packing, documents and freight; commission remotely or on site; and run annual maintenance and breakdown repair for customers in our region.
What we do not do: we do not issue CE certificates ourselves — the certificate comes from the notified body, for the configuration quoted. We do not hold vehicle type approval for converted chassis — that belongs to the licensed vehicle builder who does the conversion. And we will not quote a number we cannot stand behind when the set is on a test bench.
That positioning matters to a buyer. It means the engine serial, the alternator and the test report are all things we can put in front of you, and the accountability for the finished unit sits in one place. It also means that for a 3000 kVA power station you should be talking to the engine maker's project team, and we will say so.
Six red flags
- A price 25 % or more below the band, with no alternator datasheet offered.
- Refusal to give an engine serial number, or a photo of one, before the balance payment.
- "CE certificate" supplied as an image with no notified body number and no model listed.
- Capacity quoted in kVA only, with no kW at 0.8 pf and no statement of standby versus prime.
- Warranty given verbally, or in a chat message, with no mention of labour or freight.
- Photos of a factory that the seller will not walk through on a live video call.
From deposit to port: five steps and who owns each
- Specification and proforma invoice (supplier). Model, engine, alternator, controller, enclosure, voltage, frequency, protection, packing, incoterm, price validity.
- Deposit and build (supplier). Normally 30 % T/T in advance. Lead time runs from deposit and confirmed drawing, not from the enquiry.
- Factory test (supplier, witnessed if you want). Load test to nameplate with a printed report carrying the serial numbers. Ask for a video of the run if you cannot attend.
- Balance, booking and documents (both). 70 % before shipment or against a copy of the bill of lading. Documents: invoice, packing list, B/L, certificate of origin, test report, English manual, wiring diagram.
- Arrival and commissioning (buyer, with supplier support). Destination charges, offloading, foundation, fuel, cable, and commissioning. Confirm who attends and at what cost before the container ships.
Test this page against us
Send a load list — kW, voltage, frequency, application, destination port. We will reply with a specification, a sample load test report, the alternator datasheet and FOB / CFR / CIF pricing, usually within two working hours (GMT+8). If we cannot answer one of the six questions above, tell us.
Request a quotation See the price breakdownQuestions buyers ask
Are you a factory or a trading company?
Neither description fits exactly. We are a supplier-integrator: we specify and supply complete sets built on Yuchai, Weichai, Cummins and Perkins platforms, we load-test them, and we handle export and after-sales. We do not manufacture engines or alternators, and we say so on every quotation.
Can I visit or video-call the workshop before ordering?
Yes. A scheduled video call through the build, the test bench and the packing area is normal for a first order. If a supplier resists this, treat it as a red flag rather than a scheduling problem.
Do you supply CE for Europe?
CE configuration is available for projects that require it, with the certificate issued by a notified body for the configuration quoted. We do not self-declare. State the requirement in the enquiry so it is priced in rather than added later.
What is the minimum order quantity?
One unit. Single sets ship to end users regularly; multi-unit orders for distributors and EPC contractors are quoted with volume pricing. An MOQ of five or more usually means you are talking to a factory rather than a supplier.
How do I verify the engine is genuine and not rebuilt?
Take the serial number from the nameplate photo and check it with the engine maker's local distributor, and ask for the engine's own delivery document from the engine maker to the builder. A rebuilt or repainted unit usually shows a serial that the maker cannot match to that rating.
Who supplies spare parts after arrival?
Ask for a spare-parts list with part numbers before you order, and confirm whether the engine maker has a distributor in your country. For Yuchai, Weichai, Cummins and Perkins, that distributor is usually the fastest route; we supply the set-specific parts such as controllers, ATS and canopy hardware.
What payment terms do you accept?
30 % T/T deposit with the order and 70 % before shipment, or 70 % against a copy of the bill of lading for established customers. L/C at sight is accepted for larger projects. We do not ask for full payment up front, and we would advise against accepting such a request from any supplier.
Related: price guide and cost breakdown · order, documents and shipping · silent canopy gensets · containerized modules · Vietnam · Tay Ninh market access · all diesel generator sets 8–4000 kVA